.
Any Company
1234 Any Street
Any City, ST 14526
Bid Item Columns (small font) Report by Sequence
Your Phone
Your Email
Page 1 of 1
11/03/2016
12:04 PM
Item
Code
Description
Unit
Quantity
Total
Price
Total
Cost
Estimated By
Bid 25: Res. PB Sample for report
Material
Labor
Equip.
Sub.
Other
Cost per Bid Qty Unit
Approx.
 Unit Cost
Approx.
 Unit Price
*** Foundation ****
113.52
 3.001300
15X18 Footing
250.00
LF
147.88
36,971.23
122.21
30,554.73
0.53
0.69
 3.002500
Conc Slab 4''
1,500.00
SF
1.63
2,445.59
1.34
2,021.15
0.43
1.00
 3.003000
Fill Dirt Below Slab Sub
15.00
CF
1.29
19.42
1.07
16.05
10.00
 3.003500
Concrete Steps   Sub‑Bid
35.00
LF
12.94
453.15
10.70
374.50
 3.004800
Sand & Wire      Sub‑Bid
2.00
SF
0.45
0.90
0.37
0.74
0.35
0.09
 3.031100
# 3 (3)Per Run‑Rebar
150.00
LF
0.12
19.06
0.10
15.75
 3.030100
6X6 10/10 Wire Mesh
5.00
SF
13.72
68.61
11.34
56.70
10.80
*** Insulation ***
 7.023400
R‑19 Walls
2,500.00
SF
0.44
1,111.69
0.36
918.75
0.35
 7.023700
R‑19 Ceil. Batts
1,500.00
SF
0.44
667.01
0.36
551.25
0.35
*** Finish ***
 9.010700
1/2Drywall  8'H Intwall
175.00
LF
5.59
978.29
4.62
808.50
4.40
250.00
 8.001700
Door‑Ext 3‑0X6‑8 Df 4Pan
1.00
EA
323.68
323.68
267.50
267.50
75.00
 8.010500
Door 2‑6 Pre‑Fit H/C
3.00
HB
97.10
291.31
80.25
240.75
180.00
 8.034300
Door‑Fold  6‑0X8‑0    Hb
2.00
EA
233.04
466.09
192.60
385.20
 9.000300
Stucco Std.Fin. 9'High
250.00
LF
22.86
5,717.25
18.90
4,725.00
18.00
49,533.28
*** Bid Total *** =
40,936.57
Your tag line or anything or nothing here