Bid 35: ABC Drywall Job‑labor‑actual
Bid Item Order Quantity Report by Assembly ‑ Detail
Item
Code
Description
Unit
Bid
Quantity
Description
Order
Quantity
Raw
Cost
Cost per
TKF Unit
Unit
Cost Type
Item Ext.
Cost
 6 " Framed Wall (Board Both Sides)
LF
pcs
1.165
5,250.00
438.00
 5.280065
Material
600S‑200‑43 (18g)
5250.0000000
LF
6,727.88
1.17
LF
pcs
1.070
500.00
50.00
 5.285085
Material
600T‑200‑43 (18g)
500.00000000
LF
588.50
1.07
LF
pcs
2.917
500.00
50.00
 5.285115
Material
600SLT250‑43 Slotted Track
500.00000000
LF
1,604.35
2.92
LF
pcs
1.558
500.00
50.00
 5.285140
Material
625T‑275‑43   Slip Track
500.00000000
LF
856.90
1.56
SF
pcs
0.286
2,100.00
44.00
 9.204076
Material
5/8 Reg DW 4x12
2100.0000000
SF
660.66
0.29
LF
0.156
500.00
 9.225020
Material
Corner Bead Std.10'
50.000000000
EA
85.80
1.56
Roll
3.600
3.00
 9.225065
Material
DW Tape 500' Roll
2100.0000000
SF
11.88
0.01
EA
62.400
0.24
 9.230070
Material
1‑1/4 "Type S Fine Thread Metal
DrywallScrews
0.2400000000
Box
16.47
62.42
SF
0.010
2,100.00
 9.240001
Labor
U/C ‑Labor ‑ Stocking (1st)
2100.0000000
SF
25.20
0.01
HR
43.000
1.17
 9.240010
Labor
Labor Only‑ Layout walls
75.000000000
LF
60.37
0.67
HR
43.000
1.06
 9.240020
Labor
Labor ‑  shoot down track
75.000000000
LF
54.70
0.61
HR
43.000
20.39
 9.242010
Labor
Hang Drywall 0 to 10 ft.
2100.0000000
SF
1,052.12
0.42
HR
43.000
30.43
 9.242020
Labor
Hang Drywall over 10'
2100.0000000
SF
1,570.19
0.62
HR
43.000
30.43
 9.242030
Labor
Hang Drywall Lids up to 10'
2100.0000000
SF
1,570.19
0.62
HR
43.000
20.39
 9.243010
Labor
Tape 0 to 10 ft.
2100.0000000
SF
1,052.12
0.42
HR
43.000
30.43
 9.243020
Labor
Tape Over 10 ft.
2100.0000000
SF
1,570.19
0.62
HR
43.000
10.00
 9.243030
Labor
Install Tape on Corner Bead (10'
piece)
50.000000000
Ea
516.00
8.60
6 " Framed Wall (Board Both Sides)
18,023.52
Your tag line or anything or nothing here
Estimated By
Your Phone
Your Email
CSC Company
1524 Any Street
You City, USA
Page 2 of 2
09/04/2017
1:59 PM
Bid 35: ABC Drywall Job‑labor‑actual
Bid Item Order Quantity Report by Assembly ‑ Detail
Item
Code
Description
Unit
Bid
Quantity
Description
Order
Quantity
Raw
Cost
Cost per
TKF Unit
Unit
Cost Type
Item Ext.
Cost
144.30
Includes total hours from "labor" & "other" item cost columns
Total of Shown Bid
21,474.17
10.00%
747.11
Subtotal ‑
2,703.53
Overhead ‑
15.00%
Profit ‑
18,023.52