Estimated By
Your Phone
Your Email
.
Any Company
1234 Any Street
Any City, ST 14526
Page 1 of 2
11/03/2016
1:44 PM
Bid 25: Res. PB Sample for report
Bid Item Order Quantity Report by Subdivision ‑ Detail
Item
Code
Description
Unit
Bid
Quantity
Description
Order
Quantity
Raw
Cost
Cost per
TKF Unit
Unit
Cost Type
Item Ext.
Cost
Division  3: Concrete
Subdivision  3.00: Concrete SubContract
CY
HR
30,554.73
114.06
55.000
21.500
516.00
6.25
 3.001300
Material
Labor
15X18 Footing
250.00
LF
CY
HR
2,021.15
1.13
55.000
21.500
19.00
30.00
 3.002500
Material
Labor
Conc Slab 4''
1,500.00
SF
CY
16.05
1.00
15.000
1.00
 3.003000
Material
Fill Dirt Below Slab Sub
15.00
CF
LF
374.50
10.00
10.000
35.00
 3.003500
Material
Concrete Steps   Sub‑Bid
35.00
LF
SF
0.350
2.00
 3.004800
Subcontract
Sand & Wire      Sub‑Bid
2.00
SF
0.74
0.35
Concrete SubContract =
32,967.17
Subdivision  3.03: Conc. Reinforcement
RL
54.000
1.00
 3.030100
Subcontract
6X6 10/10 Wire Mesh
5.00
SF
56.70
10.80
PC
15.75
0.10
0.566
26.00
 3.031100
Material
# 3 (3)Per Run‑Rebar
150.00
LF
Conc. Reinforcement =
72.45
Division 3: Concrete =
33,039.62
Division  7: Thermal & Moisture
Subdivision  7.02: Insulation
SF
0.350
2,500.00
 7.023400
Subcontract
R‑19 Walls
2,500.00
SF
918.75
0.35
SF
0.350
1,500.00
 7.023700
Subcontract
R‑19 Ceil. Batts
1,500.00
SF
551.25
0.35
Insulation =
1,470.00
Division 7: Thermal & Moisture =
1,470.00
Your tag line or anything or nothing here
Estimated By
Your Phone
Your Email
.
Any Company
1234 Any Street
Any City, ST 14526
Page 2 of 2
11/03/2016
1:44 PM
Bid 25: Res. PB Sample for report
Bid Item Order Quantity Report by Subdivision ‑ Detail
Item
Code
Description
Unit
Bid
Quantity
Description
Order
Quantity
Raw
Cost
Cost per
TKF Unit
Unit
Cost Type
Item Ext.
Cost
Division  8: Doors & Windows
Subdivision  8.00: Exterior Doors
EA
267.50
250.00
250.000
1.00
 8.001700
Material
Door‑Ext 3‑0X6‑8 Df 4Pan
1.00
EA
Exterior Doors =
267.50
Subdivision  8.01: Interior Door/Pocket
1
240.75
75.00
75.000
3.00
 8.010500
Material
Door 2‑6 Pre‑Fit H/C
3.00
HB
Interior Door/Pocket =
240.75
Subdivision  8.03: Closet Doors 8‑0 Hi.
EA
385.20
180.00
180.000
2.00
 8.034300
Material
Door‑Fold  6‑0X8‑0    Hb
2.00
EA
Closet Doors 8‑0 Hi. =
385.20
Division 8: Doors & Windows =
893.45
Division  9: Finishes
Subdivision  9.00: (Used in Bid Items)
YD
18.000
250.00
 9.000300
Subcontract
Stucco Std.Fin. 9'High
250.00
LF
4,725.00
18.00
(Used in Bid Items) =
4,725.00
Subdivision  9.01: Drywall
SF
0.550
1,400.00
 9.010700
Subcontract
1/2Drywall  8'H Intwall
175.00
LF
808.50
4.40
Drywall =
808.50
Division 9: Finishes =
5,533.50
Total of Shown Bid
40,936.57
Your tag line or anything or nothing here