Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division (None):
Subdivision (None):
*** Right click ‑ Insert Descr. Headers ***
Check all costs, update for your area
Some categories may not have items
Add & delete Items as needed
*****************************
Division  1: General Requirements
Subdivision  1.00: Allowances
 1.002000
FIXTURE ALLOWANCE
$$
1.00
 1.003000
SECURITY ALLOWANCE
$$
1.00
Subdivision  1.01: Permits and Fees
 1.010100
PLAN CHECK FEE
$$
3.00
 1.011100
PERMIT MISC. ‑CITY
$$
1.00
 1.012000
GAS   CONNECTION FEE
$$
1.00
Subdivision  1.02: Admin. & Supervision
 1.020100
MANAGEMENT FEE
$$
1.00
 1.021100
CONST.SUPPORT
$$
1.00
Subdivision  1.03: Submittals ‑ Misc.
 1.030100
SHOP DRAWINGS
EA
1.00
 1.031100
SOIL TEST
$
1.00
Subdivision  1.05: Temp Service/Utility
 1.050100
TEMPORARY ELEC. POLE
EA
175.00
 1.051100
TOOL SHED
EA
350.00
 1.052100
WATER (to property line)
$$
1.00
Subdivision  1.07: Project Closeout
 1.070000
CLOSEOUT
$$
1.00
 1.070100
CLEAN‑UP
$$
1.00
Subdivision  1.08: Land & Loan Cost
 1.080100
LOT COST
$$
1.00
Subdivision  1.09: Architect & Drafting
 1.090100
CONCEPTUAL DESIGN
$$
1.00
 1.091100
PLANS ‑ PRINTING
$$
1.00
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  2: Sitework
Subdivision  2.00: Exploration/Testing
 2.000000
        Sitework
Subdivision  2.01: Clearing/Soil Treatm
 2.010000
CLEARING
$$
300.00
 2.010100
TREE  REMOVAL/RELOCATE
$$
416.00
Subdivision  2.02: Demolition
 2.020000
DEMO ‑ INTERIOR <1000 SF
SF
2.00
 2.020100
DEMO ‑ SUBCON INTERIOR
$
1.00
Subdivision  2.03: Earthwork
 2.030000
LOT GRADING
$$
1.00
 2.030100
CLEAR/GRUB/GRADE
$$
1.00
Subdivision  2.04: Foundation Excavate
 2.040000
EXCAVATION CONTRACT (SF)
SF
1.00
 2.040100
BACKHOE  FTG.w/labr‑hard soil
LF
1.87
 2.042000
remove footing dirt
CY
0.00
17.00
Subdivision  2.08: Paving & Surfacing
 2.080000
ASPHALT 2(no base)DRIVE
SF
0.00
0.45
 2.080100
ASPHALT 2(2 base)DRIVE
SF
0.92
Subdivision  2.09: Site Improvements
 2.090000
IRRIGATION 24'HEAD/15'OC
EA
27.00
Division  3: Concrete
Subdivision  3.00: Concrete SubContract
 3.000000
        Concrete
 3.000100
CONCRETE CONTRACT
$
1.00
 3.003000
Fill Dirt Below Slab Sub
CF
0.55
 3.006000
24x24x12 Piers   Sub‑Bid
EA
50.00
 3.007100
42x42x12 Piers   Sub‑Bid
EA
90.00
Subdivision  3.01: Concrete Accessories
 3.012000
ZIP STRIPS control‑joint
LF
0.30
 3.013100
6 MIL.10'x100' Visqueen
RL
24.00
Subdivision  3.03: Conc. Reinforcement
 3.030100
6x6 10/10 Wire Mesh
SF
0.21
 3.031100
# 3 (3)per run‑rebar
LF
0.09
 3.032100
# 5 (2)per run‑rebar
LF
0.60
 3.034100
# 4 Rebar Pier 24x24 EW
EA
0.25
Subdivision  3.04: Conc. Unit Cost Mat.
 3.041000
20x12 Footing Conc.Mat
LF
4.07
 3.042000
Slab Conc. Mat
CY
55.00
 3.043000
Fill Dirt Below Slab Mat
CF
0.60
 3.045100
WIRE 6/6  6/6
SF
0.20
 3.046000
24x24x12 Piers Conc.Mat
EA
8.14
 3.047100
42x42x12 Piers Conc.Mat
EA
24.97
Subdivision  3.05: Conc.Unit Cost Labor
 3.050100
LAYOUT        Conc.Labor
LF
0.25
 3.056000
24x24x12 Pier     ‑Labor
EA
64.50
 3.057100
42x42x12 Pier     ‑Labor
EA
80.62
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  4: Masonry
Subdivision  4.00: Masonry Contracts
 4.000000
        Masonry
 4.000100
MASONRY CONTRACT
$
1.00
Subdivision  4.02: Masonry Accessories
 4.020000
WALL TIES FOR VENEER
SF
0.00
 4.020100
CONCRETE LENTIL 36
EA
6.00
Subdivision  4.03: Unit Masonry
 4.030000
6x8x16  HOLLOW BLK WALLS
SF
2.50
 4.030100
8x8x16  HOLLOW BLK WALLS
SF
5.00
 4.031000
3x2‑1/4x12COM.RED BRICK
SF
6.50
Subdivision  4.04: Stone
 4.040100
ROCK VENEER manufactured
SF
5.00
Division  5: Metals & Carpentry
Subdivision  5.00: open
 5.000000
        Metals & Carpentry
Subdivision  5.01: Anchor Bolts
 5.010100
AB TEMPLATE
EA
25.00
 5.013000
1/2X12AB
EA
0.50
Subdivision  5.02: Imbedded Hardware
 5.021000
HURRICANE HOLDDOWNS
EA
0.29
Subdivision  5.04: Framing Hardware
 5.040000
Hardware Framing
SF
0.25
 5.040100
JOIST HANGERS 2x 4
EA
0.36
 5.042100
VENTS EVE  4 x 14
EA
0.75
 5.043100
VENTS GABLE END 24x14
EA
8.00
Subdivision  5.05: Fasteners
 5.050000
FASTNR LUMP SUM
LS
1.00
 5.050100
BOLTS LUMP SUM
LS
1.00
Subdivision  5.06: Nails & Glue
 5.060100
GLUE FLOOR SYS.PLYWOOD
SF
0.04
 5.062100
16p Nail Int.Walls 2x4
LF
0.14
 5.064100
NAILS #10 COMMON
LB
0.45
 5.066100
NAILS #10 FINISH
LB
0.50
 5.067000
1/2 x 4" Lag Screws
Ea
0.65
 5.067010
1/2 x 6" Lag Screws
Ea
0.90
 5.067020
1/2 x 8" Lag Screws
Ea
1.78
 5.067030
1/2 x10" Lag Screws
Ea
2.10
 5.067100
1/2 x12" Lag Screws
Ea
2.80
 5.067110
5/8 x 4" Lag Screws
Ea
1.10
 5.067120
5/8 x 6" Lag Screws
Ea
1.90
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  6: Framing Lumber
Subdivision  6.00: Plates, PT & HF
 6.000000
        Framing Lumber
 6.000100
***    PT. PLATES    ***
 6.001000
***  HEM.FIR PLATES  ***
0.00
 6.002000
2x 6‑   R/L‑HF Blocking
LF
0.33
 6.003000
2x 4‑   R/L PT
LF
0.29
 6.004100
2x 6‑R/L  PT
LF
0.44
 6.006000
2x10‑R/L  PT
LF
0.73
 6.006100
2x10‑ 8'  PT
EA
5.86
 6.007000
2x12‑14'  PT
EA
12.32
 6.007100
2x12‑16'  PT
EA
14.08
 6.008000
4x 6‑ 8'  PT
EA
9.92
 6.008010
4x 6‑10'  PT
EA
12.40
 6.008100
4x 6‑12'  PT
EA
14.88
 6.008110
4x 6‑14'  PT
EA
17.36
 6.008120
4x 6‑16'  PT
EA
19.84
 6.009000
6x 6‑ 8'  PT
Ea
25.20
 6.009100
6x 6‑10'  PT
Ea
31.50
Subdivision  6.05: Studs
 6.051000
2x 4‑10'      Studs
EA
2.26
 6.051100
2x 4‑12'      Studs
EA
2.72
 6.053000
2x 6‑ 92‑1/4  Studs
EA
2.72
 6.053100
2x 6‑104‑1/4  Studs
EA
3.40
 6.054000
2x 6‑18'      Studs
EA
6.12
 6.054100
2x 6‑20'      Studs
EA
6.80
 6.055000
2x 8‑14'      Studs
EA
6.34
 6.055100
2x 8‑16'      Studs
EA
7.25
 6.056000
3x 4‑ 14'     Studs
EA
5.18
 6.056100
3x 4‑ 16'     Studs
EA
5.92
 6.057000
3x 6‑ 14'     Studs
EA
7.77
Subdivision  6.10: 2x Std.& Btr.Demins.
 6.100100
2x 2‑R/L  STD & BTR. DF
LF
0.13
 6.101000
2x 4‑18'  STD & BTR. DF
EA
4.56
 6.101100
2x 4‑20'  STD & BTR. DF
EA
5.06
 6.102000
2x 6‑18'    2 & BTR. DF
EA
6.84
 6.102100
2x 6‑20'    2 & BTR. DF
EA
7.60
 6.103000
2x 8‑14'    2 & BTR. DF
EA
7.09
 6.103100
2x 8‑16'    2 & BTR. DF
EA
8.10
 6.104000
2x10‑R/L    2 & BTR. DF
LF
0.81
 6.104100
2x10‑ 8'    2 & BTR. DF
EA
6.53
 6.105000
2x12‑ 8'    2 & BTR. DF
EA
7.20
 6.105100
2x12‑10'    2 & BTR. DF
EA
9.00
 6.106000
2x12‑28'    2 & BTR. DF
EA
25.76
 6.106100
2x12‑30'    2 & BTR. DF
EA
27.60
 6.107000
2x14‑18'  #1 DF
EA
0.50
 6.107100
2x14‑20'  #1 DF
EA
23.33
 6.108000
2x 4‑R/L  DF Select
LF
0.32
 6.108100
2x 6‑R/L  DF Select
LF
0.48
Subdivision  6.11: Rough Carpentry
 6.110000
ROUGH CARPENTRY CONTRACT
$
1.00
 6.110100
SUB‑CONTR.ROUGH CARPENTR
SF
2.75
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  6: Framing Lumber
Subdivision  6.11: Rough Carpentry
 6.111100
EXT.WALLS TO 8'    ‑Carp
LF
5.00
 6.112100
INTERIOR WALLS     ‑Carp
LF
3.70
 6.113100
TRUSS ROOF         ‑Carp
SF
0.65
 6.114100
WINDOW INSTALL     ‑Carp
EA
45.00
 6.115100
DECKS              ‑Carp
SF
1.50
 6.116000
Frame Columns      ‑Carp
EA
150.00
 6.117000
Frame Wall 2x4‑18' ‑Carp
LF
13.18
 6.118000
Flr Jst 2x 8 @ 16oc Carp
SF
0.69
 6.118100
Flr Jst 2x10 @ 16oc Carp
SF
0.87
 6.119000
Roof 2x12          ‑Carp
SF
1.82
Subdivision  6.15: 4x Std.& Btr.Demins.
 6.150000
3x 4‑R/L  2 & BTR. DF
LF
0.37
 6.150100
3x 6‑R/L  2 & BTR. DF
LF
0.55
 6.151000
3x14‑R/L  2 & BTR. DF
LF
1.29
 6.151100
4x 4‑R/L  2 & BTR. DF
LF
0.82
 6.153100
4x 6‑ 8'  2 & BTR. DF
EA
9.92
 6.156000
4x10‑10'  2 & BTR. DF
EA
20.66
 6.156100
4x10‑12'  2 & BTR. DF
EA
24.80
 6.158000
4x12‑14'  2 & BTR. DF
EA
34.72
 6.158100
4x12‑16'  2 & BTR. DF
EA
39.68
 6.159000
4x14‑22'  2 & BTR. DF
EA
100.61
 6.159100
4x14‑26'  2 & BTR. DF
EA
118.90
Subdivision  6.20: Timbers
 6.200000
3x 6‑R/L  #1 DF
LF
1.01
 6.200100
4x 4‑R/L  #1 DF
LF
1.29
 6.201000
4x 8‑R/L  #1 DF
LF
2.59
 6.201100
4x 8‑ 8'  #1 DF
EA
20.69
 6.202000
4x10‑10'  #1 DF
EA
32.33
 6.202100
4x10‑12'  #1 DF
EA
38.80
 6.203000
4x12‑14'  #1 DF
EA
54.32
 6.203100
4x12‑16'  #1 DF
EA
62.08
 6.204000
4x14‑20'  #1 DF
EA
90.53
 6.204100
4x14‑22'  #1 DF
EA
99.59
 6.205100
4x18‑R/L  #1 DF
LF
5.82
 6.206000
6x 6‑16'  #1 DF
EA
45.12
 6.206100
6x 6‑18'  #1 DF
EA
50.76
 6.207000
6x10‑R/L  #1 DF
LF
4.70
 6.207100
6x10‑ 8'  #1 DF
EA
37.60
 6.208000
6x12‑16'  #1 DF
EA
90.24
 6.208100
6x12‑18'  #1 DF
EA
101.52
 6.209100
6x16‑R/L  #1 DF
LF
7.52
Subdivision  6.25: Glue Lams/1 x Boards
 6.252000
5‑1/8 x18   ‑ R/L GluLam
LF
13.29
 6.252100
5‑1/8 x19 1/2‑R/L GluLam
LF
14.39
 6.254000
6‑3/4 x19 1/2‑R/L GluLam
LF
18.35
 6.254100
6‑3/4 x21   ‑ R/L GluLam
LF
20.55
 6.255000
8‑3/4 x13 1/2‑R/L GluLam
LF
21.58
 6.255100
8‑3/4 x15   ‑ R/L GluLam
LF
24.11
 6.256000
1‑3/4x 9 1/2‑R/L MicrLm
LF
2.69
 6.256100
1‑3/4x11 7/8‑R/L MicrLm
LF
3.38
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  6: Framing Lumber
Subdivision  6.25: Glue Lams/1 x Boards
 6.258000
1x 3 ‑ 8'  DF
EA
1.10
 6.258100
1x 3 ‑10'  DF
EA
1.37
 6.259000
1x 6 ‑ 8'  DF
EA
1.52
 6.259100
1x 6 ‑10'  DF
EA
1.90
Subdivision  6.30: Shear Panel/Plywood
 6.300000
***    SHEAR PANEL   ***
0.00
 6.302000
4x 8‑1‑1/8STURD‑I‑F Int
EA
576.00
 6.302100
4x 8‑1‑1/8STURD‑I‑F Ext
EA
640.00
Subdivision  6.35: Facia & Overhangs
 6.350100
2x 6‑ R/L  RS DF Fascia
LF
0.40
 6.352100
2x 2‑ 8'   RS Cedar
EA
1.73
 6.353000
2x 6‑12'   RS Cedar
EA
7.80
 6.355000
1x 6‑R/L PP SL VJ
LF
0.27
 6.355100
1x 8‑R/L PP SL VJ
LF
0.36
Subdivision  6.40: Resawn
 6.400000
1x 2‑ R/L  #2 R/S DF S4S
LF
0.06
 6.401000
2x 4‑ R/L  #2 R/S DF S4S
LF
0.26
 6.401100
2x 6‑ R/L  #2 R/S DF S4S
LF
0.40
 6.402000
4x 6‑ R/L  #2 R/S DF S4S
LF
1.94
 6.402100
4x 6‑ 6'   #2 R/S DF S4S
EA
11.64
 6.403000
4x 8‑16'   #2 R/S DF S4S
EA
41.39
 6.404000
4x12‑ R/L  #2 R/S DF S4S
LF
3.88
 6.404100
4x12‑ 8'   #2 R/S DF S4S
EA
31.04
 6.405000
4x14‑12'   #2 R/S DF S4S
EA
54.32
 6.405100
4x14‑14'   #2 R/S DF S4S
EA
63.37
 6.406100
4x18‑ R/L  #2 R/S DF S4S
LF
5.82
 6.407000
6x 8‑ R/L  #2 DF R/S S4S
LF
4.20
 6.407100
6x 8‑16'   #2 DF R/S S4S
LF
67.20
 6.408000
6x16‑16'   #2 DF R/S S4S
EA
134.40
Subdivision  6.41: Redwood
 6.410040
***  RW Const smooth **      ***
 6.410050
2x 2‑ R/L Redwood
LF
0.23
 6.410060
2x 2‑ 8' Redwood
EA
1.91
 6.410070
2x 2‑10' Redwood
EA
2.39
 6.410080
2x 2‑12' Redwood
EA
2.87
 6.410090
2x 2‑14' Redwood
EA
3.35
 6.410100
2x 2‑16' Redwood
EA
3.83
 6.411000
** Rdwd 4x *****
 6.411010
4x 4‑R/L  Redwood
LF
1.21
 6.411020
4x 4‑ 8' Redwood
EA
6.19
 6.411030
4x 4‑ 10' Redwood
EA
7.74
 6.411040
4x 4‑ 12' Redwood
EA
9.29
 6.411050
4x 4‑ 14' Redwood
EA
10.84
 6.411060
4x 4‑ 16' Redwood
EA
12.39
 6.411070
4x 4‑ 18' Redwood
EA
13.94
 6.411110
4x 6‑R/L  Redwood
LF
1.21
 6.411120
4x 6‑ 8'  Redwood
EA
19.40
Subdivision  6.45: Trusses/Other wood
 6.450000
TRUSS CONTRACT
$
1.00
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  6: Framing Lumber
Subdivision  6.45: Trusses/Other wood
 6.450100
5/12 22'SP 24c Truss STD
LF
25.49
 6.451100
***       T J I      ***
 6.452100
2x 2‑ 8'   RS Cedar
EA
1.73
 6.453000
2x 6‑12'   RS Cedar
EA
7.80
 6.458000
1x 8‑ R/L RS Cedar Sidng
SF
0.36
Subdivision  6.50: Siding‑Plywood
 6.500010
***    Siding‑Plywood   ***
 6.500080
4x 8‑ 5/8 T‑111  4oc
SF
20.80
 6.500100
4x 8‑ 5/8 T‑111  8oc
SF
24.00
 6.500120
4x 8‑ 3/8 Plysawn
EA
17.28
Division  7: Thermal & Moisture
Subdivision  7.00: Waterproofing
 7.000000
        Thermal & Moisture
Subdivision  7.02: Insulation
 7.020000
******* INSULATION
 7.020100
INSULATION CONTRACT
$
1.00
 7.025000
R‑30 Ceil. BLOWN
SF
0.40
Subdivision  7.03: Roofing
 7.030100
ROOFING CONTRACT
$
1.00
 7.032000
ROOFING ARC 80
SF
1.25
 7.035000
***   Material Only  ***
 7.036000
ROOFING CONC.   mat.only
SQ
80.00
Subdivision  7.05: Flashing/Sheetmetal
 7.050100
SHEETMETAL CONTRACT
$
1.00
Subdivision  7.08: Skylights
 7.080100
SKYLT.ALUM.    22x22 SGL
EA
75.00
 7.081100
SKYLT.ALUM.    22x36 DBL
EA
110.00
 7.083100
SKYLT.BRONZE   22x48 DBL
EA
140.00
Division  8: Doors & Windows
Subdivision  8.00: Exterior Doors
 8.000000
        Doors & Windows
 8.001100
DOOR‑EXT 3‑0x6‑8 S/C HDW
EA
190.00
 8.003100
DOOR‑EXT 3‑0x6‑8 FANCY
EA
300.00
 8.005100
EXT JAMB 5‑0to6‑0 W/SILL
EA
40.00
 8.006100
CASE SET 5/8x2‑1/4
EA
8.00
Subdivision  8.01: Interior Door/Pocket
 8.010100
DOOR 2‑0 PRE‑FIT H/C HB
EA
45.00
 8.011100
DOOR 2‑4 PRE‑FIT H/C HW
EA
65.00
 8.013100
DOOR 2‑6 PRE‑FIT ELITE
EA
80.00
Subdivision  8.02: Closet Doors 6‑8 Hi.
 8.023100
DOOR‑FOLD  6‑0x6‑8   HDW
EA
185.00
Subdivision  8.03: Closet Doors 8‑0 Hi.
 8.034100
DOOR‑FOLD  5‑0x8‑0    HB
EA
160.00
 8.035100
DOOR‑FOLD  6‑0x8‑0   HDW
EA
185.00
Subdivision  8.04: Patio Door/Garage Dr
 8.041100
9/0x6/8 Alum. Glass Door
EA
355.17
 8.042100
5/0x8/0 Alum. Glass Door
EA
328.67
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  8: Doors & Windows
Subdivision  8.04: Patio Door/Garage Dr
 8.043100
10/0x8/0 Alum. Glass Dr
EA
665.15
 8.045100
9/0x6/8 BronzeGlass Door
EA
380.20
 8.046100
7/0x8/0 BronzeGlass Door
EA
396.06
 8.048100
16x 7 Garage Dr Wd.Fancy
EA
400.00
Subdivision  8.05: Wind.Alum.Frame Sldg
 8.050000
WINDOW CONTRACT
$
50.00
1.00
 8.051000
6010  Alum. Sldg. xo
EA
70.75
 8.052000
6016  Alum. Sldg. xo
EA
70.75
 8.053100
2026  Alum. Sldg. xo
EA
48.12
 8.054000
2030  Alum. Sldg. xo
EA
53.23
 8.054100
2630  Alum. Sldg. xo
EA
57.41
 8.055000
4036  Alum. Sldg. xo
EA
75.91
 8.055100
5036  Alum. Sldg. xo
EA
84.68
 8.056000
4050  Alum. Sldg. xo
EA
97.61
 8.056100
5050  Alum. Sldg. xo
EA
108.21
 8.057000
7026  Alum. Sldg.xox
EA
98.13
 8.057100
8026  Alum. Sldg.xox
EA
106.83
 8.058000
8036  Alum. Sldg.xox
EA
136.07
 8.058100
10036 Alum. Sldg.xox
EA
156.91
 8.059000
3010  Alum. Sldg.OBS
EA
53.35
 8.059100
3016  Alum. Sldg.OBS
EA
53.35
Subdivision  8.06: Wind.Alum.Frame Pic.
 8.061000
7020  Alum. Picture
EA
75.88
 8.061100
8020   Alum. Picture
EA
84.46
 8.062000
6026  Alum. Picture
EA
67.96
 8.062100
7026  Alum. Picture
EA
85.94
 8.063000
5030  Alum. Picture
EA
65.69
35.00
 8.063100
6030  Alum. Picture
EA
74.38
 8.064000
4036  Alum. Picture
EA
62.04
 8.064100
5036  Alum. Picture
EA
71.42
 8.065000
3040  Alum. Picture
EA
57.01
 8.065100
4040  Alum. Picture
EA
69.57
 8.066000
2650  Alum. Picture
EA
59.97
 8.066100
3050  Alum. Picture
EA
65.69
 8.067000
2060  Alum. Picture
EA
61.54
 8.067100
2660  Alum. Picture
EA
67.96
 8.068000
1666  Alum. Picture
EA
65.19
 8.068100
2066  Alum. Picture
EA
65.19
Subdivision  8.07: Wind.Brnz.Frame Sldg
 8.071000
6010  BronzeSldg. xo
EA
75.54
 8.072000
6016  BronzeSldg. xo
EA
75.54
 8.073100
2026  BronzeSldg. xo
EA
51.37
 8.074000
2030  BronzeSldg. xo
EA
56.80
 8.074100
2630  BronzeSldg. xo
EA
61.23
 8.075000
4036  BronzeSldg. xo
EA
80.90
 8.075100
5036  BronzeSldg. xo
EA
90.18
 8.076000
4050  BronzeSldg. xo
EA
103.77
 8.076100
5050  BronzeSldg. xo
EA
114.88
 8.077000
7026  BronzeSldg.xox
EA
105.80
 8.077100
8026  BronzeSldg.xox
EA
115.25
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  8: Doors & Windows
Subdivision  8.07: Wind.Brnz.Frame Sldg
 8.078000
8036  BronzeSldg.xox
EA
146.04
 8.078100
10036 BronzeSldg.xox
EA
168.42
 8.079000
3010  BronzeSldg.OBS
EA
60.72
 8.079100
3016  BronzeSldg.OBS
EA
60.72
Subdivision  8.08: Wind.Brnz.Frame Pic.
 8.080000
WINDOW CONTRACT
$
1.00
 8.081000
7020  Bronze Picture
EA
79.87
 8.081100
8020  Bronze Picture
EA
88.91
 8.082000
6026  Bronze Picture
EA
73.02
 8.082100
7026  Bronze Picture
EA
90.49
 8.083000
5030  Bronze Picture
EA
70.51
 8.083100
6030  Bronze Picture
EA
79.81
 8.084000
4036  Bronze Picture
EA
66.58
 8.084100
5036  Bronze Picture
EA
76.59
 8.085000
5040  Bronze Picture
EA
61.22
 8.085100
4040  Bronze Picture
EA
71.94
 8.086000
2650  Bronze Picture
EA
64.44
 8.086100
3050  Bronze Picture
EA
70.93
 8.087000
2060  Bronze Picture
EA
66.23
 8.087100
2660  Bronze Picture
EA
73.02
 8.088000
1666  Bronze Picture
EA
70.16
 8.088100
2066  Bronze Picture
EA
70.16
Subdivision  8.09: Window‑ Anderson
 8.090100
ANDSN   2/0x3/0 D/H SG
EA
110.00
 8.091100
ANDSN   3/6x3/6 D/H SG
EA
160.00
 8.092100
ANDSN  2/0x3/0 Case SG
EA
140.00
 8.093100
ANDSN PICTURE 4/0x4/0 SG
EA
150.00
 8.094100
ANDSN 1/2 ROUND 4/0
EA
350.00
Division  9: Finishes
Subdivision  9.00: Plaster/Stucco
 9.000000
        Finishes
 9.000100
STUCCO SUBCONTRACT (SF)
SF
1.00
 9.001000
Stucco Std.Fin.
SF
1.98
Subdivision  9.01: Drywall
 9.010100
DRYWALL CONTRACT
$
1.00
 9.011100
5/8Drywall 10'H IntWall
LF
5.62
 9.012000
1/2Drywall Ceil 10'High
SF
0.55
 9.013100
5/8Drywall
SF
0.56
Subdivision  9.02: Tile/Marble/Formica
 9.020000
CERAMIC TILE CONTRACT
$
1.00
 9.020100
CERAMIC TILE‑MUD STD.TOP
LF
45.00
 9.022100
MARBLE CONTRACT
$
1.00
 9.023100
MARBLE STD. 1/2 22TOP
LI
1.15
 9.024100
MARBLE ONYX SHWR.SUROUND
EA
425.00
 9.025100
FORMICA TOP 26x18SPLASH
LF
18.00
Subdivision  9.03: Mirrors & Shower Dr.
 9.030000
MIRROR & SWHR DR CONTRAC
$$
1.00
 9.033100
MIRROR 1/4PLATE install
SF
5.00
 9.034100
SHWR DR/PL 36x66 CLR BRZ
EA
190.00
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  9: Finishes
Subdivision  9.04: Millwork & trim Mold
 9.041000
NEWEL POST     HAMPTON
EA
33.00
 9.042100
1/2x1‑1/2 Base F/J
LF
0.15
 9.043100
CHAIR RAIL  2 5/8  PINE
LF
1.25
 9.044000
5/8x1‑5/8 Case Solid Set
ST
5.00
 9.044100
5/8x2‑1/4 Case Solid Set
ST
6.00
 9.045100
5/8x2‑1/4 Case Oak   Set
ST
8.00
 9.046100
Inst. Entry Frame To 3/6
EA
17.50
 9.047100
Inst. Pre‑fit
EA
4.00
 9.048100
TRIM WOOD WINDOW
EA
36.00
 9.049100
Install Master Bath Hdwr
EA
45.00
Subdivision  9.05: Acoustic Treatment
 9.051100
Reinstall Ceil Panels
SF
0.50
Subdivision  9.06: Painting/Wallcover
 9.060100
PAINTING CONTRACT
$
1.00
 9.062100
PAINT‑ENAMEL WALL 8' 2CT
LF
0.40
 9.063100
ENAMEL DOOR (panel)  2CT
EA
18.00
 9.064100
ENAMEL MOLDING       2CT
LF
0.30
Subdivision  9.07: Flooring
 9.070100
CERAMIC ENTRY TILE
SF
8.00
 9.072000
CARPET           ECONOMY
SF
0.99
 9.073100
PAD 1/2 FOAM
SF
0.22
 9.074100
HARDWOOD FLOOR‑PARQUET
SF
9.50
Subdivision  9.08: Finish Hardware
 9.080100
HDWR DOOR PASSAGE SCHLAG
EA
42.00
 9.082000
DOOR STOPS
EA
0.25
 9.082100
LOCKS WOOD WINDOWS
EA
4.00
 9.084100
PAPER HOLDER RECESS
EA
15.00
Subdivision  9.09: Specialty/Appliances
 9.090100
FIREPLACE DAMPER 36
EA
25.00
 9.091100
ANGLE IRON 42
EA
7.00
 9.092100
CHIMNEY PIPE 13x 2'
LF
6.00
 9.093100
APPLIANCE ALLOWANCE
$$
1.00
 9.094100
OVEN ‑GAS  ECON
EA
300.00
 9.095100
BURNER TOP GAS‑ECON
EA
250.00
 9.096100
MICROWAVE‑ DELUX
EA
600.00
Division 12: Furnishings
Subdivision 12.00: Cabinets
12.000000
        Furnishings
12.000100
BASE‑OAK         Cabinet
LF
100.00
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division 13: Special Construction
Subdivision 13.00: Swimming Pools
13.000000
        Special Construction
Subdivision 13.06: Landscaping
13.060000
FINE GRADING FOR LDSCAPE
$$
1.00
13.060100
SOD
SF
4.00
Division 14: HVAC
Subdivision 14.00: HVAC Contract
14.000000
        HVAC
14.002100
COLD AIR RETURN
EA
50.00
14.003100
AIR ADD TO FURNACE 3 TON
EA
1,500.00
Division 15: Plumbing
Subdivision 15.00: Water Supply/Treatmt
15.000000
        Plumbing
Subdivision 15.02: Plumbing Contract
15.020100
PLUMBING CONTRACT
$
1.00
15.021100
KITCHEN SINK   Rough‑in
EA
150.00
15.022100
SHOWER         Rough‑in
EA
150.00
15.023100
GAS TO FURNACE
EA
50.00
15.024100
WATER TO ICE MAKER
EA
60.00
15.025100
ELEC 50 GAL Water Heater
EA
150.00
Subdivision 15.03: Plumbing Fixtures
15.030100
SINK stain steel Fixt.
EA
100.00
15.031100
DISPOSAL
EA
55.00
15.032100
Toilet std Fixt.
EA
50.00
15.033100
Bidet Fixt.
EA
100.00
15.034100
TUB special Fixt.
EA
300.00
15.036100
FAUCET & TRIM ALLOWANCE
$$
1.00
15.037000
KIT.SINK SINGLE Faucet
EA
60.00
Division 16: Electrical
Subdivision 16.00: Electrical Contract
16.000000
        Electrical
Subdivision 16.01: Electrical
16.010000
ELECTRICAL BASE
$$
1.00
16.010100
SERVICE 100 AMP Elec.
EA
250.00
16.011100
OUTLET == EXT.WALLS Elec
LF
1.20
16.012100
SWITCH STANDARD Elec.
EA
15.00
16.013100
CIRCUIT‑RANGE Elec.
EA
50.00
16.014100
SMOKE DETECTOR Elec.
EA
30.00
Subdivision 16.02: Lighting
16.020100
ELEC FIXTURE ALLOWANCE
$$
1.00
Subdivision 16.04: Communications
16.040100
DOOR BELL W/TRANS Elec.
EA
30.00
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division 17: Notes
Subdivision 17.00: Take Off Criteria
17.000100
Calc‑Plates @ x 1.10%
17.001000
Calc‑Roof Shtng x 1.15%
17.001100
Calc‑Roof Shtng x 1.20%
Subdivision 17.01: Notes‑Not Included
17.010100
N.I.C. Plans
17.011000
N.I.C. Sauna
Subdivision 17.03: Notes‑Not Clear
17.030100
Not Clear‑Plans
Subdivision 17.05: Notes‑Our Std.Spec's
17.050100
Our Std.‑Conc.
Subdivision 17.07: Notes‑Allowances
17.070100
Allow‑Plans
Division 18: Conceptual Bids
Subdivision 18.00: Site/Excav/Concrete
18.001000
Ftg. 12x12 w/Steel
LF
4.50
18.002000
Conc.Slab 4 on Grade
SF
4.00
Subdivision 18.01: Structure
18.010100
Frame  8'H Wall Material
LF
3.00
18.011000
Frame 24'Span‑Floors Mat
SF
1.50
18.011100
Frame 24'Span‑Floors Lab
SF
0.80
Subdivision 18.02: Insul/Doors/Windows
18.020000
Insul. Ext. Wall R‑11 8'
LF
2.00
18.020100
Insul. Ext Wall R‑13 8'
LF
2.25
18.021000
Heat 1000 Sq. House
EA
1,000.00
18.021100
Heat 1800 Sq. House
EA
1,500.00
Subdivision 18.03: Plumb/Elec/HVAC
18.030000
Plumb. Kitchen  W/Heater
EA
700.00
18.030100
Bath Std. WC/Lav/Tub
EA
1,200.00
Subdivision 18.04: Exterior Finishes
18.040000
Stucco 1 Story House
LF
20.00
18.040100
Stucco 2 Story House
LF
45.00
Subdivision 18.05: Interior Finishes
18.050000
Drywall W.  8'H 1 SideLF
LF
3.60
18.050100
Drywall W.  8'H 2 SideLF
LF
7.20
18.051000
Paint Ceil 8'Flat 2CT SF
SF
0.40
18.051100
Paint Ceil 12'Vault 2CT
SF
0.45
Subdivision 18.06: Cabinets & Millwork
18.060000
Cabnt/Counter Tops Econ
LF
180.00
18.060100
Cabnt/Counter Tops Med.
LF
225.00
18.061000
Wood Trim Small House
EA
300.00
18.061100
Wood Trim Med. House
EA
300.00
Subdivision 18.07: Finish
18.070000
Counter Top Formica 4
LF
20.00
18.070100
Counter Top Formica Full
LF
35.00
18.071000
Appliance‑Range
EA
500.00
18.071100
Appliance‑Dishwasher
EA
400.00
Code
Description
Home Builder‑Contractor ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division 18: Conceptual Bids
Subdivision 18.08:
18.080000
Metal Pre‑Fab Fireplace
EA
1,000.00
18.080100
Brick Fireplace
EA
1.00
This list is representative of items in this price book (database). It is not all inclusive.
You can change prices, add and delete items for your needs.
In many Price Books there are hundreds even thousands more items.
Cost shown for items may not be your cost.