In many Price Books there are hundreds even thousands more items.
You can change prices, add and delete items for your needs.
This list is representative of items in this price book (database). It is not all inclusive.
Cost shown for items may not be your cost.
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division (None):
Subdivision (None):
*** Right click ‑ Insert Descr. Headers ***
Check all costs, update for your area
Some categories may not have items
Add & delete Items as needed
*****************************
Division  2: GENERAL CONDITIONS
Subdivision  2.00: MOBILIZATION
 2.000000
COLLINS MOVE
EA
200.00
 2.000100
LOWBOY MOVE
EA
300.00
Subdivision  2.10: JOB SITE COSTS
 2.100000
CONTRACTORS TRAILER
MO
200.00
 2.100100
ENGINEERS TRAILER
MO
190.00
Subdivision  2.20: JOB SITE LABOR
 2.200000
SITE SUPER
Day
300.00
 2.200100
TEAMSTER FORMEN
Day
375.00
Subdivision  2.30: MISC. GEN COND COSTS
 2.300000
LAYOUT & SURVEY
Day
800.00
 2.300100
PRE CONST PHOTOS
LS
1.00
 2.301000
SOIL TEST DENSITY(LAB)
Day
300.00
 2.301100
SOIL TEST(PROCTOR)
EA
150.00
Division  4: MATERIALS
Subdivision  4.00: PIPE PLASTIC
 4.000000
4 PVC SDR35
LF
2.00
 4.000100
4 90'S
EA
6.32
 4.001000
6 PVC SDR35
LF
1.64
 4.001100
6 90'S
EA
9.26
 4.002000
8 PVC SDR35
LF
2.39
 4.002100
8 Y'S
EA
 4.003000
10 PVC SDR35
LF
3.99
 4.003100
10 X 6 Y'S
EA
 4.004000
12 PVC SDR35
LF
5.14
 4.004100
12 X 6 Y'S
EA
 4.005000
15 PVC SDR35
LF
7.70
 4.005100
15 X 6 T'S
EA
 4.006000
18 PVC SDR35
LF
 4.006100
18X 6 T'S
EA
 4.007000
24 PVC SDR35
LF
 4.007100
24X 6T'S
EA
 4.008000
4 CPP (ADS) SOLID
LF
 4.008100
4 CPP (ADS) PERF
LF
0.40
 4.009000
15 CCP (ADS) SOLID
LF
6.02
 4.009100
15 CCP (ADS) PERF
LF
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  4: MATERIALS
Subdivision  4.05: PIPE RCP‑DIP‑CI‑CMP
 4.050000
12 RCP CL III  SJ
LF
 4.050100
15 RCP CL III  SJ
LF
7.35
 4.051000
12 RCP CL III OR
LF
 4.051100
15 RCP CL III OR
LF
 4.052000
12 RCP CL IV SJ
LF
7.00
 4.052100
15 RCP CL IV SJ
LF
7.35
 4.053000
12 RCP CL IV OR
LF
 4.053100
15 RCP CL IV OR
LF
7.35
 4.054000
4 XH CAST IRON
LF
3.92
 4.055000
8 XH CAST IRON
LF
9.92
 4.056000
12 XH CAST IRON
LF
22.86
 4.056100
4 SCH 40 ELEC CONDUIT
LF
1.25
 4.057000
8 CMP GALV
LF
 4.057100
8BANDS
EA
 4.058000
24 CMP GALV
LF
 4.058100
24 BANDS
EA
 4.059000
12 CMP COATED & PAVED
LF
6.78
 4.059100
15 CMP COATED & PAVED
LF
8.44
Subdivision  4.10: SAND & GRAVEL
 4.100000
SELECT FILL
Ton
5.40
 4.100100
CLEAN FILL
CY
5.40
 4.101100
M/M SUB‑BASE MAT'L
CY
17.55
 4.102000
TRACK CYNDERS DEL'D
CY
13.90
 4.103000
1/2 STONE P/U
CY
20.95
 4.103100
3/8 STONE DEL'D
CY
31.75
Subdivision  4.15: PRECAST CONCRETE
 4.150000
PRE CAST BUMPERS H.D.
EA
36.66
 4.150100
PRE CAST BUMPERS L.D.
EA
24.00
 4.151000
CATCH BASIN 2‑6X4‑0
EA
495.00
 4.151100
CATCH BASIN 3‑6X4‑0
EA
600.00
 4.152000
6'DIA.SOLID RING
LF
35.00
 4.152100
6'D1A.X8TOP SLAB
EA
115.00
 4.153000
8'DIA. DOME
EA
135.00
 4.154000
12'DIA.SOLID RING
LF
87.50
 4.154100
12'DIA.X 10 TOP SLAB
EA
550.00
 4.155000
GREASE TRAP
EA
280.00
 4.155100
CONCRETE DUCT SUPPORT
EA
9.00
 4.156000
DB‑6 ELECTRIC MANHOLE
EA
900.00
 4.156100
GREASE TRAP
EA
280.00
 4.157000
T.S. ELECTRIC PULL BOX
EA
750.00
 4.157100
ELECTRIC HAND HOLE 24X24
EA
250.00
 4.158000
LIGHT POLE BASE
EA
160.00
 4.158100
BOLLARD BASE
EA
45.00
Subdivision  4.20: LANDSCAPE & PARK EQ
 4.200000
TOPSOIL SCREENED
CY
11.50
 4.200100
TOPSOIL FINE SCREENED
CY
11.50
 4.201100
SOD COMMERCIAL
SF
0.22
 4.202000
STEEL EDGING W/STAKES
LF
3.16
 4.202100
HAY BALES
BL
6.00
 4.203000
PARK BENCH/TABLE
EA
160.00
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  4: MATERIALS
Subdivision  4.20: LANDSCAPE & PARK EQ
 4.203100
TRASH RECEPTACLE
EA
548.00
Subdivision  4.25: ASPHALT
 4.250000
TYPE 1 DENSE BASE 3
SY
6.00
 4.250100
TYPE 1 DENSE BASE 4
SY
8.00
 4.253000
TYPE 3 DENSE BINDER 3
SY
5.76
 4.253100
TYPE 3 DENSE BINDER 3.5
SY
6.72
 4.254000
TYPE 7 TOP (1A)2
SY
3.66
 4.254100
TYPE 7 TOP (1A)21/2
SY
5.10
 4.255000
AC KIT
EA
17.00
Subdivision  4.30: TELE.M.H,COND.
 4.300000
4 TELEPHONE DUCT 1 WAY
TF
1.25
 4.300100
4 TELEPHONE DUCT 2 WAY
TF
1.00
 4.301000
4 TELEPHONE DUCT 11 WAY
TF
6.05
 4.301100
4 TELEPHONE DUCT 12 WAY
TF
6.00
 4.302000
4 TELEPHONE DUCT 21 WAY
TF
11.55
 4.302100
4 TELEPHONE DUCT 22 WAY
TF
11.00
 4.303000
2 GALV CONDUIT 1 WAY
LF
2.50
 4.303100
2 GALV CONDUIT 2 WAY
EA
 4.304000
1 1/4 CUTTING HEAD
EA
25.00
 4.304100
11 1/4 PVC BEND X 3'R
LS
2.75
 4.305000
3 WAY FIBERGLASS ADAPTOR
EA
141.75
 4.305100
6 WAY FIBERGLASS ADAPTOR
EA
195.00
 4.306000
TYPE A TELEPHONE M.H.
EA
2,400.00
 4.306100
TYPE B TELEPHONE M.H.
EA
1,650.00
 4.307000
3/8 POLY ROPE
LF
0.05
 4.307100
JET LINE
LF
0.01
Subdivision  4.35: MISC.MATERIAL ITEMS
 4.350000
BRICK & CEMENT CASTINGS
EA
30.00
 4.350100
BRICK & CEMENT PIPE HOLE
EA
30.00
 4.355000
SAW BLADES   14
LF
0.22
 4.355100
SAW BLADES 26 RENTED
EA
150.00
 4.356100
H.M. DOOR/FRAME & HDWRE
EA
500.00
 4.357000
MISC MATERIAL COSTS
LS
1.00
 4.357100
MISC LUMBER COSTS
LS
1.00
Subdivision  4.40: DIP WATER MAIN
 4.400000
4 DIP CL 52
LF
5.00
 4.400100
4 90'S
EA
35.00
 4.401000
6 DIP CL 52
LF
7.40
 4.401100
6 90'S
EA
91.48
 4.402000
8 DIP CL 52
LF
8.40
 4.402100
8 90'S
EA
105.00
 4.403000
10 DIP CL 52
LF
10.60
 4.403100
10 90'S
EA
225.00
 4.404000
12 DIP CL 52
LF
14.00
 4.404100
12 90'S
EA
212.00
 4.405000
3/4 CORP STOP
EA
16.00
 4.405100
HYDRANT
EA
800.00
 4.406000
THREADED ROD 1/2
LF
1.80
 4.406100
FIRE HYDRANT (GREENPORT)
EA
912.00
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  4: MATERIALS
Subdivision  4.40: DIP WATER MAIN
 4.407000
8 SADDLE
EA
20.43
 4.407100
1POLY TUBING
EA
0.33
Subdivision  4.45: CONCRETE
 4.450000
2500 PSI READYMIX
CY
55.00
 4.450100
3000 PSI READYMIX
CY
62.00
 4.451000
CURB FORMS
LF
1.50
 4.451100
SIDEWALK FORMS
LF
0.50
 4.452000
12 SONOTUBE 14' LENGTHS
LF
3.00
 4.452100
SYMONS SNAP TIES
BX
36.00
 4.453000
#8 REBARS
LF
0.74
 4.453100
REBAR FABRICATION
FT
0.25
 4.454000
4/4 X 4/4 W.W.M.
SF
0.50
 4.454100
6/6 X 2.9/2.9 W W F
SF
0.18
 4.455000
EXPAN.JOINT PER SF CONC
SF
0.90
 4.455100
RED CONCRETE DYE
BG
60.00
 4.456000
CONC. BLOCK SOLID 8X8X16
EA
1.16
 4.456100
COPING (CONCRETE)
LF
15.00
Subdivision  4.50: LUMBER
 4.500000
3 OAK SHEETING
BF
0.27
 4.500100
12X12 OAK WALES 20‑0
EA
102.00
 4.501000
2X4 STD HEM FIR LUMBER
LF
0.25
 4.501100
2X6 STD HEM FIR LUMBER
LF
0.35
 4.502100
IPE BETHBARA LUMBERE
BF
1.75
Subdivision  4.55: JACKING PIPE & ASSOC
 4.550000
12DIA.STEEL JACK PIPE
LF
13.00
 4.550100
12 DIA. PIPE SPLICER
EA
35.00
 4.551000
30DIA.STEEL JACK PIPE
LF
32.00
 4.551100
30 DIA PIPE SPLICER
EA
50.00
 4.552000
18 STEERING HEAD
EA
600.00
 4.552100
24 STEERING HEAD
EA
900.00
Subdivision  4.60: CASTINGS
 4.600000
N.Y.TELEPHONE CASTING
EA
560.00
 4.600100
STD 24 H.D. FRAME GRATE
EA
125.00
 4.601000
SUFF CNTY FRAME COVER
EA
250.00
Subdivision  4.65: MISC. STEEL ITEMS
 4.650000
PIPE RAIL STEEL GALV
LF
40.00
 4.650100
PIPE RAIL STAINLESS STL
LF
80.00
 4.651000
3 1/2X4' LINTEL
LF
4.50
 4.651100
ALUM. LADDER
EA
900.00
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  6: LABOR
Subdivision  6.00: ENGINEERS
 6.000000
BACKHOE OPERATOR
Day
442.33
 6.000100
ASPH. SPREADER OPERATOR
Day
434.10
 6.001000
MIXER OPERATOR
Day
367.96
 6.001100
OILER
Day
364.75
 6.002000
BORING MACHINE OPER O.T.
HR
77.33
 6.002100
WELDER O.T
HR
78.74
Subdivision  6.10: LABORS
 6.100000
LABOR             1298
Day
283.40
 6.100100
ASPHALT SHOVLER    1298
Day
304.06
 6.101000
LOCAL 66 LABOR
Day
258.55
Subdivision  6.20: CHAUFFEURS
 6.200000
CHAUFFEUR 10 WHEEL
Day
280.00
 6.200100
CHAUFFEUR  6 WHEEL
Day
280.00
Subdivision  6.30: LATHERS
 6.300000
LATHER FORMEN
Day
369.96
 6.300100
LATHER
Day
367.51
Subdivision  6.40: CARPENTERS
 6.400000
CARPENTER FORMEN
Day
345.00
 6.400100
CARPENTER
Day
335.00
Subdivision  6.50: ELECTRICIANS
 6.500000
ELECTRICAN JOURNEYMAN
Day
345.00
 6.500100
ELECTRICAN 4th YR.APPREN
Day
179.00
Subdivision  6.60: PLUMBERS
 6.600000
PLUMBER FORMEN
Day
362.29
 6.600100
PLUMBER
Day
340.21
Subdivision  6.70: MISC. LABOR COST
 6.700000
MISC. LABOR COST
LS
1.00
 6.700100
MASON
Day
300.00
Division  8: EQUIPMENT
Subdivision  8.00: BACKHOES
 8.000000
1984 JD BACKHOE
Day
250.00
 8.000100
1987 JD BACKHOEW/EXTHOE
Day
260.00
Subdivision  8.10: PAYLOADERS
 8.100000
1987 JD 544D PAYLOADER
Day
275.00
Subdivision  8.20: PAVING
 8.200000
DYNAPAC ASP ROLLER CC‑12
Day
130.00
 8.200100
PUCKET 650 ASP.PAVER
Day
275.00
Subdivision  8.30: TRUCKING
 8.300000
1988 F.L.10 WHL DUMP #62
Day
210.00
 8.300100
1988 F.L.10 WHL DUMP #63
Day
210.00
Subdivision  8.40: COMPRS.& JACKING EQU
 8.400000
AIR COMPRESSOR 185 CFM
Day
100.00
 8.400100
AIR COMPRESSOR 175 CFM
Day
Subdivision  8.50: COMPACTION & PUMPS
 8.500000
WACKER DEISEL COMPACTOR
Day
55.00
 8.500100
WACKER PLAT TAMPER
Day
30.00
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division  8: EQUIPMENT
Subdivision  8.60: MISC. EQUIPMENT
 8.600000
4000 WATT GENERATOR
Day
55.00
 8.600100
WELDING MACHINE
Day
75.00
 8.601000
ROAD PLATES
Day
25.00
 8.601100
STEEL SHEETING BOX
Day
100.00
Division 10: RENTED EQUIPMENT
Subdivision 10.00: GRADING
10.000000
B&B JD 850 DOZER
Day
450.00
10.000100
B&B JD 650 DOZER
Day
400.00
10.001000
HFM 10C DOSER125 HP
Day
540.00
10.001100
HFM 14C WIDE TRACK DOZER
Day
680.00
Subdivision 10.10: PAVING
10.100000
BW 130 10 TN ROLLER HFM
Day
200.00
10.100100
BW 142 10 TN ROLLER HFM
Day
200.00
Subdivision 10.20: PAYLOADERS
10.200000
JD 544 PAYLOADER B&B
Day
310.00
10.200100
JD 644 PAYLOADER B&B
Day
350.00
Subdivision 10.30: EXCAVATORS
10.300000
JD 490 EXCAVATOR  B&B
Day
400.00
10.300100
JD 590 EXCAVATOR  B&B
Day
450.00
Subdivision 10.40: TRENCHING
10.400000
DITCH WITCH
Day
200.00
10.400100
SMALL TRENCHER(HAND)WORT
Day
125.00
Subdivision 10.50: MISC.RENTED EQUIPMEN
10.500000
12 CHIPPER 85HP WORTH
Day
200.00
10.501000
G.M.E.TRENCH BOX
MO
1,895.00
10.501100
AUGER RENTAL
Day
200.00
10.502000
WELL POINT SYSTEM
LS
1.00
10.502100
CONCRETE VIBRATOR (WORTH
Day
30.00
10.503000
3MISSLE‑BINDRIM
Day
165.00
10.503100
4 MISSLE‑BINDRIM
Day
210.00
Subdivision 10.60: RENTED‑load
10.600000
10 WH LOAD TO 110
CY
306.00
10.600100
18 WH LOAD TO 110
CY
595.00
10.601000
6 WH LD PRIMA
LD
25.00
10.601100
10 WHL LD MONTECAVALLO
LD
75.00
Subdivision 10.70: RENTED‑DOZER
10.700000
D‑9 BULLDOZER        M‑I
Day
1,260.00
10.700100
D‑8 BULLDOZER        M‑I
Day
1,150.00
10.701000
190‑4 DYNAHOE        M‑I
Day
776.00
10.702000
CMI CONC BREAKER   BECTO
Day
500.00
10.702100
HOE RAM            BECTO
Day
900.00
10.703000
FELLER BUNCHER  MALONEY
Day
850.00
10.703100
CONCRETE PUMP TRUCK
Day
550.00
Subdivision 10.80: RENTED‑DUMP
10.800000
10 WH DUMP           M‑I
Day
520.00
10.800100
6 WH DUMP            M‑I
Day
490.00
Subdivision 10.90: RENTED‑TANK
10.900000
TANK REMOVAL LUMP SUM
LS
1.00
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division 10: RENTED EQUIPMENT
Subdivision 10.90: RENTED‑TANK
10.900100
TANK REMOVAL
EA
10.901000
COFFERDAM
LS
1.00
10.901100
GUARD RAIL
EA
27.50
Division 12: SUB‑CONTRACTORS
Subdivision 12.00: CONCRETE
12.000000
CONCRETE LUMP SUM
LS
1.00
12.000100
CONCRETE CURB STD
LF
9.00
12.001000
HEADWALL
LS
1.00
12.001100
SAW CUT CONCRETE PAVEMNT
IF
1.00
12.002000
TRANSVERSE JOINT TIES
LF
8.50
12.002100
CLASS F CONCRETE PVMT
SY
145.00
Subdivision 12.10: FENCING
12.100000
FENCING LUMP SUM
LS
1.00
12.100100
4' C.L.FENCE
LF
26.00
12.101000
SPLIT RAIL FENCE
LF
3.25
12.101100
8' VINYL C.L.FENCE
LF
39.30
Subdivision 12.20: PAVING
12.200000
PAVING LUMP SUM
LS
12.200100
BASE PAVING TON
TN
0.00
12.201000
SEAL COAT
SF
0.07
12.201100
COLOR COAT COURTS
LS
1.00
Subdivision 12.30: LANDSCAPING
12.300000
LANDSCAPING LUMP SUM
LS
1.00
12.300100
TOP SOIL IN PLACE
SY
12.301100
HERBICIDE APPLIED
LS
1.00
Subdivision 12.40: ELECTRICAL
12.400000
ELECTRIC LUMP SUM
LS
1.00
12.400100
SITE LIGHTING
LS
1.00
12.401000
150 WATT LUMINAR
EA
320.00
12.401100
ENERGY CONNECTION
LS
1.00
Subdivision 12.50: PLUMBING
12.500000
PLUMBING LUMP SUM
LS
12.500100
WATER MAIN CONNECTION
LS
Subdivision 12.60: DUMP FEES
12.600000
10 LD TO 110
CY
270.00
12.600100
18 WH LD TO 110
LD
450.00
12.601000
6 WH LD PRIMA
LD
12.601100
10 WH LD MONTECALVO
LD
75.00
Subdivision 12.70: HIRED EQUIPMENT
12.700000
D‑9 BULLDOZER      M.I
Day
1,260.00
12.700100
D‑8 BULLDOZER      M.I.
Day
1,150.00
12.701000
633 MOTOR SCRAPER   M.I
Day
1,350.00
12.701100
637 MOTOR SCRAPER   M.I
Day
1,475.00
12.702000
POWER BROOM MOHAWK
Day
736.00
12.702100
85 TON CRANE (BAY)
Day
1,000.00
12.703100
CABLE REEL TRAILER
Day
25.00
Subdivision 12.80: HIRED TRUCKING
12.800000
10 WH DUMP       JPMP
Day
480.00
Code
Description
Sitework ‑ Price Book Item List
Unit
Unit Raw Cost
Mat.
Labor
Equip
Sub
Other
Division 12: SUB‑CONTRACTORS
Subdivision 12.80: HIRED TRUCKING
12.800100
10 WH DUMP       MANIAC
Day
480.00
Subdivision 12.90: MISC. SUB‑CONTRACT
12.900000
PUMP & REMOVE SLUDGE
GL
9.00
12.900100
SQUEGEE CLEAN TANKS
EA
475.00
12.901000
TIMBER PILES
EA
1.00
12.902000
MISC. SIGNS
EA
12.902100
MISC. SUB‑CONT COST
LS
1.00
This list is representative of items in this price book (database). It is not all inclusive.
You can change prices, add and delete items for your needs.
In many Price Books there are hundreds even thousands more items.
Cost shown for items may not be your cost.